SU Utilities: Northridge Sewer Improvement Project
-
Before the main pipe is installed: We’ll do some prep work, like locating service connections and staging equipment.
-
During pipe installation and construction: Port-a-potties will be available. We will reconnect service lines the same day or early the next day.
-
As work approaches your property: Expect timely, address-specific updates so you know what’s happening every step of the way.
-
Access along your street or driveway may be limited.
-
Before the outage: Fill containers with drinking water, minimize water usage, and move valuables from work areas.
-
During the outage: Do not flush toilets or use drains; keep pets and children away from work zones.
-
After the outage: Check for odors or backups and promptly report any issues.